See Our Work
The job entailed lifting two Spiderlift narrow access cranes and Leo23 cherry pickers up onto the first floor atrium in Westfield shopping centre, to aid lifting their Christmas decorations.
Full contract lift.CPH wrote the method statement, lift plan & risk assessment, signed off and agreed by Balfour Beatty Civil Engineering.CPH managed the lift through CPCS accredited Appointed Person who wrote the Method Statement, on the day the lift was managed by a CPCS accredited Lift Supervisor, the crane driven by CPCS A66A driver.
Laying of new dranage and concrete floor slab in a barn using a roller striker with power pack, one of Coppards many concreting products.
These images show a UNIC mini access spider crane to lifting roof trusses into place on a new build. We have a full range of narrow access spider cranes available for hire see this link for more info on our cranes: Crane Hire
This set of images show the Posi Track and Flail clearing a large area of overgrown ground. This machine is available for hire throughout the UK. We also have skidsteer’s available with planer heads, buckets, forks and brush heads.
This set of images show Solaglas who are the UK’s largest glass installer & processor using a crane, boom lift and glass lifter hired from Coppard Plant Hire Ltd.
This set if images show the building of a new bridge for Kent County Council on the Horsmonden bridle path. The concrete plinths were poured from a batch mix concrete lorry by Coppard Concrete Services. This job shows the versatility of the Unic crane in combination with the tracked dumpers that have cranes fitted to the body.
These images show the Re-surfacing of car park and access roads at the National Trust site at Cliveden. This site has magnificent formal gardens that overlooking the River Thames. For more information on this site please visit this link: National Trust
This set of images shows removal of trees and large tree stumps using excavators and stump grinders.
Repair of the steel substructure of the pier. This set of images shows the replacement and strengthening of the steelwork on the pier substructure.
Major works were undertaken to create a new car park where there was once a field. This was part of over a year’s work to various areas within the garden centre including creating a new patio area, new pond area and gardens with play areas.
Surfacing works carried out to playground at Bennett Memorial School Tunbridge Wells