Panel background image

Project Assessment and Planning

  • Our team begins by assessing the site and understanding the specific drainage needs. We collaborate with clients, local authorities, and other stakeholders to gather relevant information.
  • We consider factors such as soil type, topography, existing infrastructure, and environmental regulations.

Design and Engineering

  • Our skilled engineers create detailed drainage plans. These plans outline the layout of drains, sewers, and other components.
  • We select appropriate materials, pipe sizes, and gradients to ensure efficient water flow.
  • If necessary, we incorporate sustainable drainage solutions like permeable surfaces or rain gardens.

Site Preparation

  • Before installation, we clear the site of any obstacles, debris, or vegetation.
  • Excavation begins to create trenches for drainage pipes. We use machinery like excavators and backhoes.

Pipe Installation

  • We lay down the drainage pipes according to the design. These pipes can be made of materials like PVC, concrete, or HDPE.
  • Proper alignment and slope are crucial to ensure water flows smoothly.
  • We connect pipes using fittings, couplings, and seals.

Manholes and Inspection Chambers

  • We install manholes and inspection chambers at strategic points along the drainage network.
  • These access points allow maintenance, inspection, and cleaning of the system.

Backfilling and Compaction

  • After pipe installation, we carefully backfill the trenches with suitable material (often crushed stone or sand).
  • Compaction ensures stability and prevents settling.

Testing and Inspection

  • We conduct pressure tests and flow tests to verify the integrity of the system.
  • Inspections ensure compliance with standards and safety regulations.

Surface Finishing

  • We restore the surface (e.g., roads, pavements, landscaping) disrupted during excavation.
  • Proper reinstatement ensures minimal impact on the surroundings.